8.Each dryer should be operated through one complete cycle to assure that no further adjustments are necessary and that ALL components are functioning properly.

9.Make a complete operational check of ALL operating controls.

a.Microprocessor controller (computer) programs/selections...

1)Each microprocessor controller (computer) has been preprogrammed by the factory with the most commonly used parameter (program) selections. If computer program changes are required, refer to the computer programming manual which was shipped with the dryer.

b.Dual timer dryers check...

1)Heating Timer

2)Cool Down Timer

3)Temperature Selection Switch

38

Page 42
Image 42
American Dryer AD-120ES manual