5.3-Phase (3ø) Wiring Connections/Hookup

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and some- times Neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

IMPORTANT: A CIRCUIT SERVING EACH DRYER MUST BE PROVIDED.

a. Gas and Steam Model Dryers ONLY

1) 3-Phase (3ø) Wiring Connection/Hookup

For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left corner of the dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the service box and contactor, the service box cover must be removed

Providing local codes permit, power to a gas or steam dryer can be made by the use of a flexible U.L. listed power cord or pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer and service box area.

b.Electric Dryers ONLY - 3-Phase (3ø) Hookup

The electrical input connection is made into the electric oven contactor located at the upper rear of the dryer. Input connection wiring must be sized properly to handle the dryer's current draw. This in- formation is printed on the dryer's data label.