CAUTION: The dryer must be grounded. A ground lug has been provided for this purpose.

IMPORTANT: A CIRCUIT SERVING EACH DRYER MUST BE PROVIDED.

The only electrical connections to the dryer are the 3-phase (3ø) leads (L1, L2, L3, and sometimes Neutral) and ground. Single-phase (1ø) power for the control circuit is done by the factory at the contactor (relay), and no other wiring connections are.

NOTE: Electrically heated service (amperage) specifications/requirements not available at time of of printing. Contact factory for update.

22

Page 26
Image 26
American Dryer Corp EURO-24 manual Important a Circuit Serving Each Dryer Must be Provided