American Dryer Corp ID-120 installation manual Dryer Enclosure Requirements

Models: ID-120

1 54
Download 54 pages 9.72 Kb
Page 17
Image 17

C. DRYER ENCLOSURE REQUIREMENTS

Even though a 30-inch (76.2 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 3 feet (0.91 meters) from nearest obstruction (i.e. wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.2 cm) and must not extend more than 4-inches (10.2 cm) to the rear of the dryer front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 2-inch (5.08 cm) clearance is required.

NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be located a minimum of 12-inches (31 cm) above the top of the dryer.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (46 cm) above the dryer console (module) is suggested. Dryers may be positioned sidewall to sidewall however, 1 or 2-inches (2.54 or 5.08 cm) is suggested between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closing of the control and lint doors.

13

Page 17
Image 17
American Dryer Corp ID-120 installation manual Dryer Enclosure Requirements