American Dryer Corp ID-120 installation manual Unpacking/Setting Up

Models: ID-120

1 54
Download 54 pages 9.72 Kb
Page 15
Image 15

10. The dryer must be installed with provisions for adequate combustion and make-up air supply.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

B. UNPACKING/SETTING UP

Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.

IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.

The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint door in place.

1.Leveling Dryer

a.To level the dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.

11

Page 15
Image 15
American Dryer Corp ID-120 installation manual Unpacking/Setting Up