American Dryer Corp ML-410 manual Adjustments, Lubrication

Models: ML-410

1 67
Download 67 pages 38.35 Kb
Page 59
Image 59

B. ADJUSTMENTS

7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws (bearing set screws), nonpermanent gas connections (i.e., unions, shut-off valves, orifices), and grounding connections. Fan (impellor) V-belts, along with the drive motor V-belts should be examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer switch, sail switch, burner and hi-limit thermostats).

30 DAYS AFTER INSTALLATION

SHUT OFF ALL POWER TO THE DRYER. Verify that the electrical connections to the motor contactors and overloads are tight. This is done to accommodate the compression of the wires over time.

C. LUBRICATION

MONTHLY

The two (2) 1-3/4-inch (4.45 cm) bearings that support the impellor/fan shaft should be lubricated. Use Shell Alvania #3 grease or its equivalent. Impellor/fan shaft bearings must be lubricated.

EVERY 3 MONTHS

The four (4) 2-inch (5.08 cm) bearings that support the drive and idler shaft should be lubricated. Use Shell Alvania #3 grease or its equivalent. Drive and Idler shaft bearings must be lubricated. The motor bearings, idler bearings...and under normal/most conditions the tumbler bearing are required to be lubricated.

55

Page 59
Image 59
American Dryer Corp ML-410 manual Adjustments, Lubrication