SECTION IX
PROCEDURE FOR FUNCTIONAL CHECK
OF REPLACEMENT COMPONENTS
1.Microprocessor Controller (Computer) Board
a.Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer.
b.Start the drying cycle.
c.Verify that the
d.Verify that the motor(s) heat and door indicator lights on the back side of the microprocessor controller (computer) board are lit. (Refer to the illustration below.)
44 |