2-5
Powering On and Connecting Equipment
1. Power on the unit.
2. Connect the equipment.
3. Connect the data line cables.
4. Power on the connected equipment.
Performing the System Test
Before connecting equipment to the S10 or S15 Power Conditioner with Battery
Backup, ensure that the unit is functional by connecting the AC Power Cord
(provided) at the rear panel. Press the front panel power switch. Once power is
applied to the unit, the display provides the information screens shown in Figures 7
through 15, and defined as follows:
APC - LEGENDARY RELIABILITY
screen (Figure 7) – ensures that the unit is
functional, and to let you know we place our well-earned reputation at the forefront
of this product.
Figure 7. APC - LEGENDARY RELIABILITY Screen
Model Identification
screen
(Figure 8) — shows that the proper firmware was
installed for the model purchased.