
Introduction
Operating MasterSwitch VM continued
Configuring  | Sequenced Reboot. This action is available only through Master Outlet  | |||||||||
outlets for  | Control. Initiating this action immediately powers off all outlets. Each  | |||||||||
operation,  | outlet will wait the longest Reboot Duration time (in seconds) in the set  | |||||||||
continued  | of outlets on a MasterSwitch VM unit plus its own Power On Delay.  | |||||||||
  | When these two delays expire, the outlet will be turned on. | |||||||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Outlet is on  | 
  | 
  | 
  | 
  | |
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Sequenced Reboot†  | 
  | 
  | ||||
  | 
  | 
  | 
  | command is issued  | 
  | 
  | ||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||
  | 
  | 
  | 
  | Outlet is turned off  | 
  | 
  | ||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Longest Reboot  | 
  | ||||
  | 
  | 
  | 
  | 
  | Durationexpires  | 
  | ||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Power On Delay  | 
  | ||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
Never
Delay
Cancel command
is issued
Outlet
remains off
Power On Delay
expires
Outlet is
turned ons
Continued on next page
MasterSwitch VM User’s Guide  | 7  |