American Standard 2555.400  Spray Installation,  Lift Rod Guide Installation, Front, Cold

Models: 2555.400

1 8
Download 8 pages 1.73 Kb
Page 2
Image 2
SPRAY INSTALLATION

SPRAY INSTALLATION

Assemble SPRAY BODY (1) to BIDET.

Using putty, seal underside of SPRAY

BODY FLANGE (2) and secure with

NUT (3).

Thread SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY BODY (1). Connect other end of HOSE (4) with SEAL WASHER (6) to bottom outlet NIPPLE (7) of the TRANSFER VALVE (8).

Thread SPRAY CAP (9) onto SPRAY BODY (1).

8

2

9

PUTTY

 

7

1

6

 

 

 

LIFT ROD GUIDE INSTALLATION 3

5

4

LIFT ROD GUIDE INSTALLATION

Unscrew LIFT ROD NUT (1) from LIFT ROD GUIDE (2).

Make sure SEAL (3) is seated into ESCUTCHEON of LIFT ROD GUIDE (2).

Drop LIFT ROD GUIDE (2) into rear hole of bidet and from below secure with ROD GUIDE NUT (1).

 TEE AND HOSE CONNECTIONInstall SEAL (4) into coupling nut of TEE (5) and 2

3

1

 TEE AND HOSE CONNECTION

Insert SEAL (1) into ADAPTER (2) and tighten ADAPTER (2) to side of TRANSFER VALVE (3)

Install SEAL (4) into coupling nut of TEE (5) and

 

 

6

tighten connection to ADAPTER (2)

 

 

 

 

 

Connect HOSE COUPLING NUTS (6) to Hot

6

 

 

and Cold valve bodies and securely tighten.

 

 

 

 

5

4

3

 

 

 

 

2

1

 

Front

 

WATER SUPPLY CONNECTIONS

NOTE: FLEXIBLE SUPPLIES ARE NOT INCLUDED AND HAVE TO BE PURCHASED SEPARATELY.

Connect water supplies to FITTING (1) with 1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8" O.D. BULL-NOSE RISERS (3). Use adjustable wrench to tighten connections.

Do not over tighten. Be careful not to kink copper supply when bending. Use tubing cutter to cut to proper length.

1

2

COUPLING NUT

 

3

Hot

Cold

 

FERRULE

.        3 & 7     

Page 2
Image 2
American Standard 2555.400  Spray Installation,  Lift Rod Guide Installation,  Tee And Hose Connection, Front, Cold