CAUTION!
Be sure no interference is present in and around the azimuth axis opening during antenna rotation.
After tensioning both ends of azimuth cable assembly, rotate azimuth to limits of travel (clockwise and counterclockwise) several times to distribute cable tension evenly.
Recheck/verify cable tension at both ends of azimuth cable(s) in accordance with the above recommended procedure. Repeat above cable tensioning procedure if necessary.
If changed earlier, reset the software limits and reconfigure the hardware limits for
Verify proper software and hardware limit switch operation.
Replace cable tension access port cover and rear rain shield.