VERTICAL CONTACT TOASTER
OPERATION
Operating Instructions
1.Set the Bun Thickness Compression Knobs (Figure 7) to the desired settings.
NOTE: After initial run of
2.Turn the Rocker Switch (power On/Off) to on (Figure 6).
3.Turn the temperature control to 10. Allow 30 min- utes
4.Drop buns into toaster (Figure 6). Cut sides of heel and crown must face each other.
5.Toasted product will drop into the bun landing area (Figure 6).
6.Test at least 4 buns before putting toaster into service. Turn temperature control to lower setting for lighter toasting or to higher setting for darker toasting.
7Turn the Rocker Switch (power On/Off) to off when finished toasting and follow the daily clean- ing procedures.
Bun Thickness |
| |
Adjustment Controls |
| |
(See Figure 6) |
| |
3 | 6 | |
2 | 5 |
|
4 | 1 |
|
1 | 4 |
|
5 | 2 |
|
6 | 3 |
|
Reset | Protective |
Button | cap. |
Temperature Control
Bun Landing | Rocker Switch |
| |
Area |
|
Safety Features
A
If the unit requires continuous resetting, contact your Authorized Service Agency.
CONVEYOR INTERLOCK SAFETY SWITCH
A Conveyor Interlock Safety Switch is located on top of the unit under the Heat Shield (Figure 1). The Conveyor Belt Chains will not rotate unless the Heat Shield is in place and activating the Conveyor Interlock Safety Switch properly.
|
| Figure 6. Toaster Controls |
| |||||||
| 3 |
| THICKNESS | THICKNESS | 6 |
| ||||
|
|
|
|
|
|
|
|
| ||
| 2 |
|
|
|
|
|
| 5 |
|
|
|
|
|
| 4 |
|
|
|
|
| 1 |
|
|
|
|
|
|
|
|
|
| |
1 |
|
|
| 1 | = | 1/2"(12.7mm) | 4 |
|
| |
|
|
|
|
|
|
| ||||
|
|
|
| 2 | = | 5/8"(15.9mm) |
|
|
| |
|
|
| 5 | 3 | =11/16"(17.5mm) |
|
| 2 | ||
|
|
| 4 | = | 3/4"(19.1mm) |
|
| |||
| 6 |
| 5 =13/16"(20.6mm) |
| 3 |
| ||||
|
| 6 | = | 7/8"(22.2mm) |
|
| ||||
Figure 7. Bun Thickness Compression Knobs |
10 | P/N 1010807 Rev. E 06/06 |