VERTICAL CONTACT TOASTER

MAINTENANCE (continued)

Replacing the Optional Roller Tensioners

1.Remove the acorn nuts and old roller Tensioner Assembly (Figure 12).

2.Replace Tensioner Assembly, and reassemble.

3.Make sure the spacers are placed inside the Tensioner arm. The spacers are smaller than the holes to allow the Tensioner to pivot freely.

Acorn Nuts

Weld

 

Screws

Tensioner

Assy.

Spacers

Teflon Tape

Figure 12. Replacing Roller Tensioner Assy.

Replacing the Spring Tensioners

1.Remove the acorn nuts (Figure 13).

2.Remove old Spring Tensioner Assembly.

Measuring the Optional Roller Tensioners

1.Measure the Roller Tensioner on both inner Conveyor Covers (Figure 14)). Adjust or replace any damaged ones as recommended. The space between the inner Conveyor Cover and bottom of the Tensioner wheel should be 13/16” (2.1 cm) or the height of a U.S. Nickel.

Figure 14. Measuring Roller Tensioner

3.Replace Tensioner Assembly and reassemble unit.

Acorn Nuts

Weld

 

Screws

Teflon Tape

 

 

Spring

 

Tensioner

 

Assy.

Figure 13. Replacing Spring Tensioner Assy.

14

P/N 1010807 Rev. E 06/06

Page 14
Image 14
Antunes, AJ VCT-1000 owner manual Replacing the Optional Roller Tensioners, Replacing the Spring Tensioners