Antunes, AJ VCT-1000 INSTALLATION continued, Vertical Contact Toaster, Aligning Belt Teeth

Models: VCT-1000

1 24
Download 24 pages 2.82 Kb
Page 8
Image 8
INSTALLATION (continued)

VERTICAL CONTACT TOASTER

INSTALLATION (continued)

Installing the Optional Belt Wraps and Roller Tensioners

NOTE: Beltwraps and Roller Tensioners are REQUIRED on models with manufacturing number 9210716 and 9210722.

INSTALLING BELT WRAPS

NOTE: Depending on toaster usage and how well they are cleaned daily, the Belt Wraps should last between 3 - 6 months. Additional Belt Wraps may be purchased from your Authorized Service Agency.

Upper Yellow Support Rod

Belt Rotation

Lower Yellow

ION

CAUT

 

Support Rod

 

 

Belt Wrap

 

Pin

1.Ensure that the Rocker Switch (power On/Off) is set to OFF, the power cord is unplugged, and the unit is cool before proceeding.

2.Remove the Bun Feeder and Heat Shield and set the Bun Thickness Compression Knobs to 6 and 6 (Figure 7).

3.Open both Conveyor Covers and install the Belt Wraps around the Conveyor Belt Chains inside the yellow rods with the “zipper” flap exposed and hanging down (Figures 3 & 4).

4.Close the Conveyor Cover(s), set the Compression Control Knobs back to their normal settings and reinstall the Heat Shield and Bun Feeder.

INSTALLING OPTIONAL ROLLER TENSIONERS

1.Install the Tensioner Assembly and reassemble the unit (Figure 5).

2.Make sure the spacers are placed inside the Tensioner arm. The spacers are smaller than the holes to allow the Tensioner to pivot freely.

Figure 3. Installing Optional Belt Wraps

INCORRECT CORRECT

Figure 4. Aligning Belt Teeth

 

CAUTION

Align the ends of the Belt Wrap properly (Figure 13)

or the Belt Wrap may be damaged.

 

CAUTION

Position the Belt Wrap UNDER the upper and lower

yellow support rods or damage to the unit may occur.

Acorn Nuts

Weld

 

 

Screws

Tensioner

 

Assy.

 

 

Spacers

 

Teflon

 

Tape

Figure 5 Installing Optional Roller Tensioner

 

Assembly

8

P/N 1010807 Rev. E 06/06

Page 8
Image 8
Antunes, AJ VCT-1000 INSTALLATION continued, Installing the Optional Belt Wraps and Roller Tensioners, Aligning Belt Teeth