7Smart-UPS® VT and MGE™ Galaxy™ 3500 10-30 kVA 208 V MBP Installation
Installation

Overview

Warning: Review “Safety” on page1 before starting this installation. Pay strict
attention to all safety warnings and caution notices!
• ALL INTERNAL cable connections were made prior to shipment.
• EXTERNAL cable connections with the UPS need to be made on-site. EXTERNAL cable
connections from the utility also need to be made on-site. EXTERNAL cable is not supplied.
• Control wire connections between the UPS and the MBP additionally need to be made on-site.
Control wires are not supplied.
• Panel board breakers must be ordered separately. Tie-wraps are not supplied.

Tool s

The following tools are required for this installation:

Panel board breakers

The 42-position panel board supports the following Square D® 1-, 2-, and 3-pole bolt-on circuit
breakers. All of the circuit breakers listed below have been pre-tested and approved by APC.
• Dolly/hand-truck • M10 nut driver
• Tape measure • Standard (flathead)
• Pliers • Phillips screwdriver
• Level T30 Torx screwdriver
• Marker • 4mm Allen wrench
• Drill • 1/2” socket with ratchet
Breaker Type APC Part# Breaker Type APC Part#
1-pole, 20Amp PD1P20ABBSD 3-pole, 20Amp PD3P20ABBSD
2-pole, 20Amp PD2P20ABBSD 3-pole, 80Amp PD3P80ABBSD
2-pole, 30Amp PD2P30ABBSD 3-pole, 100Amp PD3P100ABBSD