Manuals
/
APC
/
Computer Equipment
/
Surge Protector
APC
operation manual PMF3XS-B PMJ3XS-B PMP3XS-B PMH3XS-B PMG3XS-B PML3XS-B
Models:
PML3XS-B
PMJ3XS-B
PMH3XS-B
PMF3XS-B
PMP3XS-B
PMG3XS-B
1
1
24
24
Download
24 pages
5.78 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Install
Wiring Diagrams without Integral Switch
SurgeArrest Replacement Modules
Dry Contact Configuration
SPD Wiring
LED Status Indicators
Testing
Precautions
Safety
Page 1
Image 1
Installation and
Operation Manual
APC Brick Panel Products
PMF3XS-B
PMJ3XS-B
PMP3XS-B
PMH3XS-B
PMG3XS-B
PML3XS-B
Page 2
Page 1
Image 1
Page 2
Contents
Installation and Operation Manual
PMF3XS-B PMJ3XS-B PMP3XS-B PMH3XS-B PMG3XS-B PML3XS-B
APC Brick Panel Products
Compliant with UL1449 3rd Edition requirements dated September 29
Table of Contents
Precautions
Precautions
LOSS OF BRANCH CIRCUIT POWER/LOSS OF SURGE SUPPRESSION
DANGER
Precautions
LOSS OF SURGE SUPPRESSION
PM3XS-B
175 kA 2 seconds
Introduction
Testing
Introduction
Introduction
Proper installation is imperative to maximize the modular Surge Protective Device’s SPD’s effectiveness and performance. The installer should follow the steps outlined in this instruction bulletin to ensure proper installation. Read the entire instruction bulletin before beginning the installation. These instructions are not intended to replace national or local electrical codes. Check all applicable electrical codes to verify compliance. Installation of modular surge suppressors should only be performed by qualified electrical personnel
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Identification Nameplate Installation Considerations
Unpacking and Preliminary Inspection Storage Safety Labels
Service Clearance Equipment Performance
Inspection
Electrical
Electrical
Voltage Rating
Voltage Ratings
Branch Circuit Overcurrent Protection and Disconnect Means
Terminals, Wire Size, and Installation Torque
Electrical
DANGER
Location
Figure 2 SPD Wiring
Location of SPD
Grounding
Grounding
HAZARDOUS TOUCH VOLTAGE
Installation
Installation
Conduit Location and Recommendations Special Enclosure Considerations
the cables are removed, reconnect the cables as marked
Wiring
Wiring
DANGER
DANGER
Figure 3 SIngle-Phase, Three-Wire, Grounded Installation
Wiring Diagrams without Integral Switch
Figure 4 Three-Phase, Three- or Four-Wire, Grounded Wye Installation
Wiring
Operation
LED Status Indicators
Operation
Figure 6 SurgeArrest Module LEDs
Table 4 SurgeArrest Replacement Modules
Audible Alarm Surge Counter
Figure 7 Three-Phase Diagnostic Display Panel with Surge Counter
Operation
Dry Contacts
Table 5 Dry Contact Configuration
Operation
DANGER
Preventive Maintenance
Maintenance
Maintenance and Troubleshooting
DANGER
Troubleshooting
Troubleshooting
Replacement Parts
Troubleshooting Flowchart
Installation and Operation Manual
Installation and Operation Manual
Page
APC Worldwide Customer Support