Table of Contents
Precautions | 4 |
Introduction | 6 |
Unpacking and Preliminary Inspection | 8 |
Storage | 8 |
Safety Labels | 8 |
Identification Nameplate | 8 |
Installation Considerations | 8 |
Environment | 8 |
Audible Noise | 8 |
Mounting | 8 |
Service Clearance | 8 |
Equipment Performance | 8 |
Electrical | 9 |
Voltage Rating | 9 |
Terminals, Wire Size, and Installation Torque | 10 |
Branch Circuit Overcurrent Protection and Disconnect Means | 10 |
Location of SPD | 11 |
Grounding | 12 |
Installation | 13 |
Conduit Location and Recommendations | 13 |
Special Enclosure Considerations | 13 |
Removing and Reconnecting the RJ45 Patch Cables | 13 |
NEMA 3R Applications | 13 |
Optional Flush Mounting | 13 |
Optional Integral Switch | 13 |
Wiring | 14 |
Wiring Diagrams without Integral Switch | 15 |
Operation | 16 |
LED Status Indicators | 16 |
Audible Alarm | 17 |
Surge Counter | 17 |
Dry Contacts | 18 |
Maintenance and Troubleshooting | 19 |
Preventive Maintenance | 19 |
Troubleshooting | 20 |
Replacement Parts | 20 |
Customer Support | 24 |
Installation and Operation Manual | 3 |