Aprilaire 8620 System test menu CONTINUED, System test TABLES, Setup & Testing

Models: 8620

1 11
Download 11 pages 48.64 Kb
Page 8
Image 8
System test menu (CONTINUED)

Setup & Testing

System test menu (CONTINUED)

Each equipment test will begin with the selection of turning on the output or stage as shown below..

Press System test TABLES or Manual background to change the selection..

Press [NEXT] to accept the selection and proceed to the next step.

If YES is selected, the thermostat will test the corresponding output. If NO is selected, the thermostat will proceed to the next step.

Temperature

 

 

 

 

 

 

 

 

 

 

Humidity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Outdoor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Equipment Test

 

 

 

 

 

 

 

 

 

Temperature

 

 

 

 

 

 

 

 

 

 

Selection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Test to be run

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

While the equipment test is active the corresponding test information will be shown..

Press [NEXT] to accept the selection and proceed to the next test selection.

 

Humidity

Temperature

 

 

Outdoor

 

Temperature

Equipment Test

Output StatuS

Selection

 

 

Test that

 

is active

Setup & Testing

System test TABLES

 

 

 

 

Heat / Cool Heating Equipment Test

 

 

 

 

 

 

 

Heat Type

 

 

 

 

W

 

 

W2

 

 

Y

 

Y2

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas

 

1st Stage Test

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas

 

2nd Stage Test

 

ON

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electric

 

1st Stage Test

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

ON

Electric

 

2nd Stage Test

 

ON

 

 

ON

 

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Pump Heating Equipment Test (Electric Heat)

 

 

 

 

 

Compressor

 

Aux

 

 

 

 

 

 

 

 

 

 

 

 

O/B set to

 

Stages

Stages

 

 

W

 

 

W2

 

Y

 

Y2

 

O

 

B

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

1

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

1

1

2nd Stage Test

ON

 

 

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

1

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

2

1

2nd Stage Test

 

 

 

 

 

ON

 

ON

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

1

3rd Stage Test

ON

 

 

 

ON

 

ON

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

1

2

2nd Stage Test

ON

 

 

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

3rd Stage Test

ON

 

ON

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2

2nd Stage Test

 

 

 

 

 

ON

 

ON

 

 

 

ON

ON

2

2

3rd Stage Test

ON

 

 

 

ON

 

ON

 

 

 

ON

ON

2

2

4th Stage Test

ON

 

 

ON

 

ON

 

ON

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: System Variable 31, O/B operation selects O or B.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Pump Heating Equipment Test (Gas Heat)

 

 

 

 

 

Compressor

 

Aux

 

 

 

 

 

 

 

 

 

 

 

 

O/B set to

 

Stages

Stages

 

 

W

 

 

W2

 

Y

 

Y2

 

O

 

B

G

1

1

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

1

2nd Stage Test

ON

 

 

 

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

1

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

1

2nd Stage Test

 

 

 

 

 

ON

 

ON

 

 

 

ON

ON

2

1

3rd Stage Test

ON

 

 

 

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

1

2

2nd Stage Test

ON

 

 

 

 

 

 

 

 

 

 

ON

 

1

2

3rd Stage Test

ON

 

ON

 

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2

1st Stage Test

 

 

 

 

 

ON

 

 

 

 

 

ON

ON

2

2

2nd Stage Test

 

 

 

 

 

ON

 

ON

 

 

 

ON

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2

3rd Stage Test

ON

 

 

 

 

 

 

 

 

 

 

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

2

4th Stage Test

ON

 

 

ON

 

 

 

 

 

 

 

 

ON

 

Note: System Variable 31, O/B operation selects O or B.

14

15

Page 8
Image 8
Aprilaire 8620 installation instructions System test menu CONTINUED, System test TABLES, Setup & Testing