CL1008 / CL1016 User Manual

Powering Up

Power up the installation according to the following procedure:

1.Power on the first station (CL1008 / CL1016) and wait a few seconds for the unit to ascertain its station ID.

2.Plug in the power adapters for each daisy-chained station on the installation in turn (second station, then third station, etc.).

Each ACS1208A / ACS1216A has an LED display on its front panel to indicate its station ID (the station ID for the first stage unit is 01, the ID for the second stage unit is 02, the ID for the third stage unit is 03, etc.).

In each case, wait for the station ID to be ascertained and displayed on the station ID LED before plugging in the next station.

3.After all the stations are up, power on the computers.

Powering Off and Restarting

If it becomes necessary to power off the CL1008 / CL1016, or if the switch loses power and needs to be restarted, wait 10 seconds before powering it back on. The computers should not be affected by this, but if any of them should fail, simply restart the affected computers.

16