2. Installation
6.For each Second Stage unit, plug the power adapter cable into its Power Jack, then plug the power adapter into an AC source.
7.Plug the First Stage unit's power adapter cable into its Power Jack, then plug the power adapter into an AC source.
8.Turn on the power to all the computers.
Note: The Power On sequence requires that all Second Stage units be powered on first. After all the Second Stage units have been powered on, then the First Stage unit must be powered on next. After the Second and First stage units have been powered on, the computers can be powered on.
Two Stage Installation Diagram
F/W UPGRADE
F/W UPGRADE
15