Operation
Hot Plugging
The Master View
1.When hot plugging cables from the CPU ports the cable must be plugged back into the same port it was removed from.
2.You may unplug the mouse and plug it back in again (to reset the mouse, for example), as long as you use the same mouse.
If there is no response to mouse and/or keyboard after you plug the mouse back in, perform a K/M Reset by inserting a thin pointed object into the Reset receptacle on the unit’s front panel and gently pushing.
Powering Off and Restarting
If it becomes necessary to Power Off any of the Master View units, before starting it back up you must do the following:
1.Shut down all the computers that are attached to the unit, as well as all the stations (Second Stage Master Views) and all the computers that are daisy chained down from it (all the child stations and the computers attached to them).
Note: You must unplug the power cords of any computers that have the Keyboard Power On function that are connected to the shut down Master Views. Otherwise, the switches will still receive power from the computers.
2.Wait 10 seconds, then restart the
Note: When the
3.Restart the Second Stage Master Views.
4.After all the Master View’s are up, power On the computers.
Port Selection
Instant access to any computer on the installation is provided by the menu driven On Screen Display (OSD) function. OSD operation is discussed in the next section.
9 |