Section 5
Appendix A – Configuration Straps
5.1Configuration Straps (CB1 - 23, JP1 - 8)
By adding the I/O and EBI expansion connectors, users can connect their own peripher- als to the evaluation board. These peripherals may require more I/O lines than available while the board is in its default state. Extra I/O lines can be made available by disabling some of the
CB1 |
|
|
|
Closed(1) | AT91 PB5/A23/CS4 signal is connected to the EBI expansion connector |
| |
|
|
Open | AT91 PB5/A23/CS4 signal is not connected to the EBI expansion connector |
| |
| This authorizes users to connect the EBI expansion connector of this board |
| to the MPI expansion connector of an AT91EB63 Evaluation Board without |
| conflict problems. |
|
|
|
|
CB2, CB3, |
|
CB4 | ADC Enabling |
|
|
Closed(1) | ADC (U20) control lines enabled |
Open | ADC (U20) control lines disabled. This authorizes users to connect the |
| corresponding PIO to their own resources via the I/O expansion connector. |
|
|
|
|
CB5 | Battery Power Supply Supervisory Enabling |
|
|
Closed(1) | Battery power supply is supervised by the ADC (U20) channel 1 via a |
| resistor bridge. The ratio is set to 0.3333 so that the battery voltage range |
| can be supervised (5.5V to 6.2V). |
|
|
Open | Battery power supply is not connected to the ADC (U20) channel 1. This |
| authorizes users to connect the corresponding ADC channel to their own |
| resources via the I/O expansion connector. |
|
|
AT91EB42 Evaluation Board User Guide |