CyberChiller Series Installation, Operation & Maintenance Manual

MAIN P 208-575

INTERCONNECTING FIELD

WIRING (TO BE INSTALLED

IN ACCORDANCE WITH

NFPA 70, N.E.C.)

MAIN POWER SUPPLY 208-575V/3PH/60Hz

24VAC

AIR COOLED CONDENSER

INTERCONNECTING FIELD WIRING (TO BE INSTALLED IN ACCORDANCE WITH NFPA 70, N.E.C.)

Figure 7- Interconnecting Field Wiring Remote Condenser
2.6.4.1Air-Cooled Split System Remote Condenser

See Figure 7. Systems equipped with a remote condenser require field wiring between the evaporator system and the remote condenser. Refer to the wiring diagram supplied with the condenser (typically located in the condenser electric box).

The installer must provide main power wiring to the main power distribution block located within the remote condenser control box. A separate equipment ground lug is provided within the electrical box for termination of the earth ground wire.

The installer must also wire two control conductors from the terminal board within the evaporator unit to the control terminal board within the remote condenser control box. Refer to the supplied electrical schematic for proper wire terminations.

2.6.4.2Glycol Systems With Outdoor Fluid Pump Package

See Figure 8. Systems equipped with a glycol system pump package require field wiring between the drycooler unit and pump package. The installer must wire two control conductors from the terminal board within the drycooler to the pump package electrical box. Refer to the supplied electrical schematic for proper wire terminations.