Checklist for Completed Installation

1 Proper clearances for service access have

been maintained around equipment.

2 Equipment is level and mounting fasteners (if applicable) are tight.

3 Piping completed to refrigerant or coolant loop (if required).

4 All field installed piping leak tested.

5 Refrigerant charge added (if required).

6 Incoming line voltage matches equipment nominal nameplated rating ± tolerances.

7 Main power wiring connections to the

11 Foreign materials have been removed from

inside and around all equipment installed (shipping materials, construction materials, tools, etc.).

12 Compressors and pumps rotate freely without unusual noise.

13 Inspect all piping connections for leaks during initial operation.

equipment, including earth ground, have been properly installed.

8 Customer supplied main power circuit breaker

(HACR type) or fuses have proper ratings for equipment installed.

9 All wiring connections are tight.

10 Control wiring connections completed to

evaporator and condenser/condensing unit (if required), including wiring to wall mounted control panel and optional controls.