Avalon Stoves 99200149, ZC Kit dimensions Vent Termination Requirements See the illustration below

Models: 99200149 ZC Kit

1 8
Download 8 pages 61.11 Kb
Page 3
Image 3
Vent Termination Requirements (See the illustration below)

ZC Kit – Large Pellet Insert

(99200149)

Vent Termination Requirements (See the illustration below)

Must have an approved cap (to prevent water from entering) or a 45° downturn.

If the termination is located on a windy side of the house, an approved house shield is recommended to prevent soot from building up on the side of the house.

Must not be located where it will become plugged by snow or other material.

Horizontal terminations must protrude 12" from the wall, vertical terminations require 24".

C

G

X

A

G NOTE: Measure clearances to the nearest edge of the exhaust hood. F B

H Manual backgroundManual background F

A

Manual background E

D

Manual background NOTE: Measure clearances to the nearest edge of the exhaust hood.

AMinimum 4' clearance below or beside any door or window that opens

BMinimum 1' clearance above any door or window that opens

CMinimum 2' clearance from any adjacent building

DMinimum 7' clearance above any grade when adjacent to public walkways NOTE: Vent may not terminate in covered walkway or breezeway.

EMinimum 2' clearance above any grass, plants, or other combustible materials

FMinimum 3' clearance from any forced air intake of any other appliance

GMinimum 2' clearance below eaves or overhangs

HMinimum 1' clearance horizontally from combustible wall

X

Must be a minimum of 2' above the roof

Page 3 of 8

10/9/06

© Travis Industries, Inc.

Page 3
Image 3
Avalon Stoves 99200149 dimensions Vent Termination Requirements See the illustration below, ZC Kit - Large Pellet Insert