AE SERIES

INTERCONNECTION

THE FOLLOWING ARE PRINCIPLES OF INSTALLATION.

PLEASE NOTE: LOCAL, FEDERAL, OR NEC CODES PREVAIL OVER THESE SUGGESTIONS.

Abbreviations:

 

 

GEN

=

Generator Assembly

ATS

=

Automatic Transfer Switch

Load Center

=

Customer's Normal Panel

Emergency Load Center

=

Those circuits in a separate load box that will

 

 

be powered by the generator.

Public Service

=

Normal Power Supplier

GEN to ATS Wiring:

?3 wires for AC load (4 if three phase) sized for the generator's load amperage.

?A Ground wire is to connect all circuits (GEN, ATS, Load Centers) to the building's ground system.

?2 wires, 14 gauge twisted pair for GEN remote start signal.

GEN to ATS Optional:

?120 -volt feed for GEN mounted battery charger.

?12 -volt wires (4) for building mounted battery charger.

Load center to ATS:

?3 wires for AC feed (four for three phase), sized for ATS rating.

?A ground wire is connected to all circuits (GEN, ATS, Load Centers) to the building's ground system.

ATS to emergency Load Center:

?3 wires for AC feed (four for three phase), sized for ATS rating.

?A ground wire is to connect all circuits (GEN, ATS, Load Centers) to the building's ground system.

Page 31 of 45

Page 38
Image 38
Baldor AE12, Automatic Emergency Pow'r Products manual AE Series Interconnection, Abbreviations