Installation Adjustments
Screws A, B, C and D (M4) : upper fixation latch. nutdriver 7mm. Screw A', B', C' and D' (M4) : lower fixation latch. nutdriver 7mm.
Loosen the four hexagon screws A, A', B and B', upper and lower fixation latch. These screws fasten the cooling house of the red tube. Pivot the red CRT until the center of the red image coincides with the center of the green image. If the angle of the red CRT is corrected, tighten the four bolts.
red crosshair green crosshair
Move the red CRT towards the green
CRT
red crosshair
green crosshair
Move the red CRT to the outside, away from the green CRT
ENTER continues to blue and green crosshairs.
EXIT will return to CRT projection angle adjustment.
Loosen the four hexagon screws C, C', Dand D', upper and lower fixation latch. These screws fasten the cooling house of the blue tube. Pivot the blue CRT until the center of the blue image coincides with the center of the green image. If the angle of the red CRT is corrected, tighten the four bolts.
blue crosshair green crosshair
Move the bleu CRT to the outside, away from the green CRT
blue crosshair
green crosshair
Move the bleu CRT towards the green
CRT
ENTER continues to the path selection menu.
EXIT returns to the CRT projection angle adjustment.
A' A B B' | C'C D D' |
A' A |
| B B' | C'C | D D' | |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CRT
PROJECTION ANGLE
ADJUSTMENT
Align crosshairs
<ENTER> continue <EXIT> to return
CRT
PROJECTION ANGLE
ADJUSTMENT
Align crosshairs
<ENTER> continue <EXIT> to return
7 - 8 |
| 5975987A BARCODATA 708 260597 |
|