Baxi Potterton 24 Eco HE manual Installation, Fitting the Flue Cont

Models: 24 Eco HE

1 48
Download 48 pages 44.7 Kb
Page 22
Image 22
8.7Fitting the Flue (Cont)

Waste

Fig. 26

Y

Flue

Inner Flue Support Bracket

Fig. 27

8.0INSTALLATION

8.7Fitting the Flue (Cont)

5.Mark dimension ‘Y’ on the flue as shown (Fig. 26). Carefully cut the waste material from the flue, ensuring that the ducts are square and free from burrs.

6.The inner flue duct support bracket may be in the waste portion of the flue. In this case retrieve the bracket before discarding the waste.

7.Take the inner flue support bracket (if not already fitted) and engage it over the flue duct. This will centralise the flue and air ducts, and ease assembly (Fig. 27).

8.Insert the flue through the hole in the wall. Fit the elbow to the boiler adaptor, ensuring that it is pushed fully in.

9.Draw the flue back through the wall and engage it in the elbow. It may be necessary to use soap solution or similar to ease assembly of the elbow adaptor and flue (Fig. 28).

10.Make good between the wall and air duct outside the building.

11.Fit the flue trim if required, and if necessary fit a terminal guard (see Section 7.9 & 7.10).

VERTICAL FLUE

1.Only a flue approved with the Potterton Performa

24Eco HE can be used.

2.For information on vertical flues consult the Potterton Flue Guide brochure.

Flue Elbow

Flue Trim

Fig. 28

22

Publication No. 5111811

Page 22
Image 22
Baxi Potterton 24 Eco HE manual Installation, Fitting the Flue Cont