15.0 FAULT FINDING
Carry out initial fault finding checks
1.Check that gas, water and electrical supplies are available at the boiler. Electrical supply = 230V ~ 50 Hz.
CH water system pressurised to 0.5 bar when the boiler is cold. The preferred minimum gas pressure is 19.5mbar (natural gas), or 36mbar (propane).
2.Carry out electrical system checks, i.e. Ground Continuity, Resistance to Ground, Short Circuit and Polarity with a suitable meter. NOTE: These checks must be repeated after any servicing or fault finding.
3.Ensure all external controls are calling for heat and check all external and internal fuses. Before any servicing or replacement of parts ensure the gas and electrical supplies are isolated.
Refer to Section 13.1 “Illustrated Wiring Diagram” for position of numbered terminals
Central Heating - Follow operational sequence
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| NOTE: When instructed to turn the Selector | |
Turn selector to |
|
|
|
|
|
| NO |
|
|
|
|
|
| to the reset position turn the Selector | ||||||
| neon illuminated |
|
|
| Go to section ‘A’ |
|
|
| Switch fully anticlockwise against the spring | |||||||||||
|
|
|
|
|
|
|
| |||||||||||||
|
|
|
|
|
| |||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| pressure and hold for 2 seconds to reset | |
| YES |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| the boiler. | ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| Go to section ‘B’ |
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| YES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Turn |
|
| thermostat | NO |
| External controls and, | NO |
| Ensure controls are set to |
| ||||||||||
| ||||||||||||||||||||
| to max. |
| where fitted, integral timer |
| demand and verify the |
| ||||||||||||||
|
|
|
|
|
| |||||||||||||||
| Pump runs |
|
| calling for heat |
|
| contacts are closed |
| ||||||||||||
| YES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary flow switch | NO | ||
operated |
| ||
|
|
| |
YES |
|
| |
|
| NO | |
|
| ||
Fan runs at max speed | |||
| |||
|
|
| |
YES |
|
| |
|
|
|
Air pressure | NO | ||
switch proved |
| ||
|
|
|
|
YES |
|
|
|
|
| ||
|
|
|
|
Spark at ignition |
|
Go to section ‘C’
Turn the selector switch to the ‘Reset’ position and hold for at least 2 seconds. If regular resetting is required, or appliance still does not operate, investigation is necessary
Go to section ‘E’
Go to sections ‘J’, ‘L’ &
‘D’
NO |
electrodes for up to 10 |
seconds |
YES |
Burner on | neon | NO | |||||
illuminated |
| ||||||
|
|
|
|
|
|
| |
YES |
|
|
|
| YES | ||
|
|
| |||||
| |||||||
Burner extinguishes | |||||||
after 10 seconds |
| ||||||
|
|
| |||||
NO |
|
|
|
|
| ||
|
|
| |||||
|
|
|
|
|
| ||
Burner output | NO | ||||||
modulates until set | |||||||
| |||||||
temperature is reached |
| ||||||
| |||||||
|
|
|
|
|
|
| |
YES |
|
|
| YES | |||
|
| ||||||
|
|
|
|
|
| ||
Burner goes out |
illuminated
NO
Replace PCB
Go to section ‘F’
Go to section ‘I’
Go to section ‘G’
Fan stops
YES
YES
Turn selector to the reset position. If the light does not extinguish go to sections H & K
Pump stops
YES
Operation sequence
correct
Publication No. 5111811 | 41 |