Baxi Potterton BBU 15 HE manual Air Cowl Air Duct Collar Ribs Terminal Cap

Models: BBU 15 HE

1 44
Download 44 pages 8.24 Kb
Page 23
Image 23

Air Cowl

Fig. 29

Air Duct

Collar

5 ribs

Fig. 28

Fig. 30

Fig. 31

Fig. 32

Terminal

Cap

Cement around Air Duct Collar &Cowl

Fig. 33

Fig. 34

© Baxi Heating UK Ltd 2009

7.0Installation

7.2Flue System (cont.)

16.Pass the air duct collar and air cowl over the 60mm flue duct (Fig. 28) and secure the collar to the closure plate with the screws supplied (Fig. 29). The air cowl will fit snugly over the collar.

17.Cut the protruding 60mm flue duct down so that 5 ribs are visible and fit the remaining 60mm lip seal into the first groove (Fig. 30). The flue duct adaptor can now be fitted in the same manner as the boiler adaptor (Fig. 31).

18.Fit the terminal cap over the flue duct adaptor and air cowl. Once the cap is clipped into position it cannot be removed easily without damage (Fig. 33).

19.Cement over the closure plate and air duct collar to a depth of approximately 100mm. Consideration should be given to the potential accumulation of snow in this area, and the possibility of it blocking the air inlet

(Fig. 34).

23

Page 23
Image 23
Baxi Potterton BBU 15 HE manual Air Cowl Air Duct Collar Ribs Terminal Cap