Manuals
/
Brands
/
Household Appliance
/
Boiler
/
Baxi Potterton
/
Household Appliance
/
Boiler
Baxi Potterton
BBU 15 HE
- page 40
1
40
44
44
Download
44 pages, 6.7 Mb
40
© Baxi Heating UK Ltd 2009
14.0 Notes
Contents
Main
2
Natural Gas
Building Regulations and the Benchmark Commissioning Checklist
ISO 9001 FM 00866
Installer Notification Guidelines
Legislation
Codes of Practice, most recent version should be used
IMPORTANT - Installation, Commissioning, Service & Repair
Safe Manual Handling
General
Preparation
Technique
Remember
Contents
1.0 Introduction
1.1 Description
1.2 Contents
2.0 General Layout
2.1 Layout (Fig. 3)
2.0 General Layout
2.2 Flue Kit (10m & 12.5m) (Fig. 3a)
10
3.0 Technical Data
3.1 Bermuda HE CBBU 15 HE
4.1 Water Circulating Systems
4.2 Treatment of Water Circulating Systems
4.3 Pipework
4.4 System Controls
12
4.5 Fully Pumped Open Vent System (Fig. 5)
4.6 Storage Systems
4.7 Sealed Systems (Figs. 6, 7 & 8)
14
4.7 Sealed Systems (cont)
Initial System Pressure (bar) Expansion Vessel Volume (litres)
1.0 V x 0.11
1.0 V x 0.087
5.1 Builders Opening (Fig. 9)
5.2 Location
5.3 Fireplace Opening & Surround
5.4 Firefont Frame Extension Kit
16
5.5 Flue
5.6 Ventilation
5.7 Gas Supply (Fig. 11)
5.8 Electrical Supply (Fig. 11)
18
5.9 Condensate Drain - General
5.10 Condensate Disposal (Fig. 12)
5.10 Condensate Disposal (cont.)
5.11 Condensate Pump Operation
20
6.0 Boiler Internal Wiring
- greygr
6.1 Boiler Internal Illustrated Wiring Diagram
- brown - black - blue - white - yellow
br bk b w y
7.1 Initial Preparation
7.2 Flue System
22
7.2 Flue System (cont.)
24
7.3 Siting the Boiler
12
7.4 Water Connections
3
N
7.5 Gas Connection
8.0 Completion & Commissioning
8.1 Completion
8.2 Commissioning the Boiler
26
8.0 Completion & Commissioning
8.2 Commissioning the Boiler (cont.)
9.0 Annual Servicing
9.1 Annual Servicing
28
9.0 Annual Servicing
9.2 Annual Servicing - Inspection
10.1 Changing Components
10.2 Spark Generator (Fig. 46)
10.3 Electrode Assembly (Fig. 47)
10.4 Condensate Pump (Fig.48)
30
10.5 Fan (Fig. 49)
10.6 Burner (Fig. 50)
10.7
10.8 Gas Valve (Fig. 51)
32
10.9 PCB (Fig. 54)
10.10 NTC (Fig. 53)
10.11 Safety Thermostat (Fig. 52)
10.12 Float Switches (Fig. 55)
11.0 Setting the Gas Valve
11.1 Setting the Gas Valve (CO2check)
34
NOTE: When instructed to operate the reset button, press and hold for 5 seconds to reset the boiler.
12.1 Initial Fault Finding Checks
12.2 Error Codes
Page
Fault Finding Solutions Sections
A B
C
D
E
F
I
H
K
J L
13.0 Short Parts List
Page
Page
Page
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
CONTROLS
ALL SYSTEMS
CENTRAL HEATING MODE
COMBINATION BOILERS ONLY
SERVICE RECORD
Service Provider
SERVICE 1
SERVICE 3
SERVICE 5
9.0 Warranty & Service
Please complete the boxes below
DDMYY M