Baxi Potterton BBU 15 HE manual GAS Boiler System Commissioning Checklist

Models: BBU 15 HE

1 44
Download 44 pages 8.24 Kb
Page 42
Image 42

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.

Customer Name

Address

Boiler Make and Model Boiler Serial Number Commissioned by (print name) Company Name

Company Address

Telephone Number

Gas Safe Register licence No. Telephone Number

Commissioning Date

To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:

Building Regulations Notification Number (if applicable)

CONTROLS Tick the appropriate boxes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Time and Temperature Control to Heating

Room Thermostat and

 

 

Programmable

 

 

Load/Weather

 

 

Optimum Start

 

 

 

 

 

 

 

 

 

Programmer/Timer

 

Room Thermostat

 

 

Compensation

 

 

 

 

 

Control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Time and Temperature Control to Hot Water

 

 

 

Cylinder Thermostat and Programmer/Timer

 

Combination Boiler

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heating Zone Valves

 

 

 

 

 

 

 

Fitted

 

 

Not Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Hot Water Zone Valves

 

 

 

 

 

 

 

Fitted

 

 

Not Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thermostatic Radiator Valves

 

 

 

 

 

 

 

Fitted

 

 

Not Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Automatic Bypass to System

 

 

 

 

 

 

 

Fitted

 

 

Not Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Boiler Interlock

 

 

 

 

 

 

 

 

 

 

 

 

Provided

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ALL SYSTEMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What system cleaner was used?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What inhibitor was used?

 

 

 

 

 

 

 

 

 

Quantity

 

 

 

 

 

litres

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CENTRAL HEATING MODE Measure and Record:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Rate

 

 

 

 

m3/hr

OR

 

 

 

 

 

 

 

 

 

ft3/hr

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burner Operating Pressure (if applicable)

 

 

 

 

mbar

OR

Gas Inlet Pressure

 

 

 

 

 

mbar

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Central Heating Flow Temperature

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

°C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Central Heating Return Temperature

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

°C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBINATION BOILERS ONLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is the installation in a hard water area (above 200ppm)?

 

 

 

 

 

 

 

 

Yes

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If yes, has a water scale reducer been fitted?

 

 

 

 

 

 

 

 

 

Yes

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

What type of scale reducer has been fitted?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DOMESTIC HOT WATER MODE Measure and Record:

 

 

 

 

 

Gas Rate

 

m3/hr

OR

 

 

 

 

 

 

Burner Operating Pressure (at maximum rate)

 

mbar

OR Gas Inlet Pressure (at maximum rate)

Cold Water Inlet Temperature

 

 

 

 

 

Hot water has been checked at all outlets

 

 

Yes

 

Temperature

 

 

 

Water Flow Rate

 

 

 

 

 

ft3/hr

mbar

°C

°C

l/min

CONDENSING BOILERS ONLY

The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798

Yes

 

 

 

 

 

 

ALL INSTALLATIONS

If required by the manufacturer, record the following

CO2

% OR CO

ppm OR CO/CO2 Ratio

The heating and hot water system complies with the appropriate Building Regulations

Yes

 

 

 

 

 

 

The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions

Yes

 

 

 

 

 

 

The operation of the boiler and system controls have been demonstrated to and understood by the customer

Yes

 

 

 

 

 

 

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

Yes

 

 

 

 

 

 

Commissioning Engineer’s Signature

 

 

 

Customer’s Signature

 

 

 

(To confirm satisfactory demonstration and receipt of manufacturer’s literature)

*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.

42

©Heating and Hotwater Industry Council (HHIC)

www.centralheating.co.uk

Page 42
Image 42
Baxi Potterton BBU 15 HE manual GAS Boiler System Commissioning Checklist