Bloomfield 600 manual SERVICING INSTRUCTIONS continued, Brewer is ready to use

Models: 600

1 30
Download 30 pages 45.57 Kb
Page 29
Image 29
12.Brewer is ready to use.

SERVICING INSTRUCTIONS (continued)

7. Set the tank back into the brewer. Reassemble the tank lid to

the water tank. Make sure the gasket is properly in place, then reinstall the hold-down strap.

8.Reinstall wiring to heating element and thermostat. Reinstall the hi-limit thermostat (if removed). For brewers with hot water faucet, reassemble faucet piping. Verify that all internal components are dry, then reinstall the top panel.

10.Reconnect brewer to electrical supply and, for automatic brewers, reconnect water supply.

11.Install the brew chamber without filter paper or grounds. Run at least three full brew cycles and discard all water generated.

12.Brewer is ready to use.

NOTE: Normally, silicone hoses do not need to be delimed. Should deliming hoses become necessary, Bloomfield recommends replacing the hoses.

27

Page 29
Image 29
Bloomfield 600 manual SERVICING INSTRUCTIONS continued, Brewer is ready to use