Bloomfield 9311 owner manual INSTALLATION INSTRUCTIONS continued, Electric Shock Hazard

Models: 9311

1 24
Download 24 pages 7.43 Kb
Page 8
Image 8
INSTALLATION INSTRUCTIONS (continued)

INSTALLATION INSTRUCTIONS (continued)

CAUTION:

Electric Shock

Hazard

Brewer must be properly grounded to a reliable earth ground to prevent possible shock hazard. Do not assume a plumbing line will provide such a ground. Electrical shock may cause serious injury.

ELECTRICIAN’S INSTALLATION INSTRUCTIONS

Refer to Electrical Specifications, page 1.

Brewer requires a dedicated single-phase circuit:

Model 9311 120/240 Volt AC, 50/60 Hz 4-Wire 20 Amps.

IMPORTANT:

Initial set-up must be performed by a qualified installer or qualified service technician. Improper set-up will damage the brewer and void the warranty.

IMPORTANT:

Complete water line installation before connecting brewer to electrical power.

MAKE SURE THE FRONT PANEL "TANK HEATER" SWITCH IS IN THE OFF POSITION BEFORE CONNECTING BREWER TO ELECTRICAL POWER.

DO NOT turn the TANK HEATER switch on until the water tank is filled. Heating element must be completely submerged in water at all times. Damage to the brewer caused by operating the heating elements dry is NOT covered by warranty.

INITIAL SET-UP INSTRUCTIONS

Plumber’s and Electrician’s installation procedures must be completed before proceeding with the set-up.

Be sure all electrical connections are secure, and that all plumbing connections are secure and leak-proof.

1. CHECK BREWER FOR PROPER CONFIGURATION

Make sure spray disk gasket is in place INSIDE of spray head.

Make sure spray disk is properly installed. Check hot water faucet for proper operation.

2. FILL WATER TANK

Be sure TANK HEATER switch is OFF, then connect brewer to electric power.

Insert an empty brew chamber under the brew head. Place an empty satellite in position. Turn the VOLUME SELECTOR switch to 1 GAL.

Press START. Water will begin filling the tank. Repeat until water flows from the brew chamber. For initial start-up, tank requires two or more 1 GAL. cycles to fill.

3.CHECK HEATING

Press TANK HEATER switch ON. Water in tank will heat to brewing temperature in approximately 30 minutes. When the water temperature reaches the brew temperature set point, the READY-TO-BREW light will glow.

Hold a suitable container under the hot water faucet, then open the faucet . Continue drawing water until all trapped air is expelled.

661 74415 9311 Single Satellite Brewer

6

Page 8
Image 8
Bloomfield 9311 INSTALLATION INSTRUCTIONS continued, Electric Shock Hazard, Electrician’S Installation Instructions