Appliance details
Recommended exhaust vent terminator position
Fig. 16
Ref. | Description | Minimum distance | |
|
|
| |
A | Directly below an opening; operable windows, doors and any non- | 36 in | |
mechanical fresh air openings | |||
|
| ||
|
|
| |
| Below a gutter, sanitary pipework or eaves | 24 in | |
B | Below a gutter, sanitary pipework or eaves, protected by metal | 12 in | |
| shielding | ||
|
| ||
|
|
| |
C | From any internal corner | 12 in | |
D* | Above ground | 12 in | |
|
| ||
Above a paved sidewalk | 7 ft | ||
| |||
| From an opposing wall or structure facing the termination | 24 in | |
E |
|
| |
From any other building opening, gas utility meter, service regulator | 36 in | ||
| |||
| or the like | ||
|
| ||
|
|
| |
F | From a terminator facing a terminator | 48 in | |
G | Vertically between two exhaust vent terminators on the same wall | 60 in | |
|
|
| |
H | Horizontally between two exhaust vent terminators on the same wall | 12 in | |
|
|
| |
| Horizontally from combustion air inlet of 250 SX | 36 in | |
I** |
| ||
Vertically above or below combustion air inlet of 250 SX | |||
| |||
|
|
| |
| From the combustion air inlet of any other equipment | 6 ft | |
J | From any external corner | 12 in | |
K | Horizontally from an opening; operable windows, doors and any | 12 in | |
|
| ||
|
|
| |
L | Vertically from a wall, roof slope, or obstruction (venting through a | see ABOVE THE ROOF | |
flat or pitched roof) | requirements on following page | ||
| |||
|
|
|
Table 3
* Subject to local codes and anticipated snow level
** Other equipment that operates with a mechanical air inlet may require greater distances, reference manufacturer's instructions
6 720 607 057 | 13 |