![Gas Requirements](/images/new-backgrounds/81464/8146417x1.webp)
Installation
Gas Requirements
Make certain that gas shutoff valve and all burner controls are in the
_k_ cauti°n:
OFF position before beginning.
Shut off main gas supply valve before disconnecting the old range and leave it off until the new
other gas appliances when you turn the gas back on.
The gas supply line and electrical outlet must be located in the shaded space as shown in See Figure 4: Gas Supply Line and Electrical Outlet Placement.
131/8"
(.333rnrn)(98mrn) 3d'
(762 ram)
41/2"
114.3rnm
Figure 4: Gas Supply Line and Electrical Outlet Placement
| If not | already present, install gas shut | off valve in an easily accessible location. | |||
| Make sure all users know where and how to shut off the gas supply to the range. | |||||
|
|
| Note: |
|
|
|
|
|
| The installer should inform | the consumer of the location of the gas | ||
|
|
| shutoff valve. |
|
|
|
| Important note for LP users |
|
| |||
| The range | is shipped from | the factory | for use with natural gas. For use with pro- | ||
| pane | (LP) gas, your range | must first be converted using the | LP conversion kit. | ||
Cabinet Requirements | This | unit is designed for installation near adjacent walls and | projecting surfaces | |||
| constructed | of combustible | materials. | Prepare the countertop | and cabinets as |
shown in See Figure 5: Cutout Requirements - Typical Installation.
English 7