Bradford-White Corp U130T*FRN, Eco Defender warranty Anode Inspection And Replacement

Models: U130T*FRN Eco Defender

1 28
Download 28 pages 61.78 Kb
Page 25
Image 25
ANODE INSPECTION AND REPLACEMENT

SERVICE PROCEDURE ED-IX

Dip Tube and Anode

Inspection and Replacement

ANODE INSPECTION AND REPLACEMENT

this procedure. Take necessary precaution to prevent personal injury.Manual backgroundManual background WARNING

Heater components and stored water may be HOT when performing the following steps in

this procedure. Take necessary precaution to prevent personal injury.

Step 1. Turn off water supply to water heater. Rotate gas control knob to the “OFF” position.

Gas Control Knob Shown In

“OFF” Position

Step 2. Turn off cold water supply to heater. Connect hose to drain spigot of water heater and route to an open drain. Open a nearby hot water faucet to vent heater for draining. Open drain spigot of hot water heater and allow heater to drain to a point below the outlet connection nipple.

Step 3. Disconnect outlet nipple from plumbing system.

Step 4 With an appropriate wrench, remove outlet nipple/anode from the water heater. Use caution not to damage pipe threads.

Step 5. Visually Inspect outlet nipple/anode. Outlet nipple/anode should show signs of depletion, this is normal.

If depletion is ½ of the original anode diameter (approximately ¾” diameter), replacement is recommended. If any of thesteel core of the anode is exposed, replacement is recommended.

Step 6. Upon completion of inspection or subsequent replacement, reinstall outlet nipple/anode into heater. Connect nipple to plumbing system, resume water supply and refill heater with water.

Step 7. To resume operation, follow the instructions located on the lighting instruction label or the lighting instructions located in the installation and operation manual.

Page 25

25

Page 25
Image 25
Bradford-White Corp U130T*FRN, Eco Defender warranty Anode Inspection And Replacement