4 Replacement Procedures 4.18 Switch Cover and Switch Board
4-64
Satellite A100/A105 / TECRA A7
Maintenance Manual
Install the Switch Cover and Switch Board
Install the switch board according to the following procedures and Figure 4-40.
1. Seat the switch board in the correct position.
2. Secure the switch board with two M2.5x4 black flat-head screws.
3. Connect the switch board flat cables to CN4000 on the switch board.
4. Secure the EMI tape and Mylar in the correct position.