WITH WITH PURONR R-410A REFRIGERANT SIZE
TABLE OF CONTENTS
Installation Instructions
548J*14D SINGLE PACKAGE ROOFTOP HEAT PUMP
ELECTRICAL SHOCK HAZARD
SAFETY CONSIDERATIONS
UNIT OPERATION AND SAFETY HAZARD
548J*14D
C09895
Fig. 1 - Unit Dimensional Drawing - Size 14 Unit
548J*14D
Vertical Connections / Economizer Horizontal Connections / Economizer
Jobsite Survey
INSTALLATION
Fig. 1 - Unit Dimensional Drawing - Size 14 Unit cont
Fig. 2 - Service Clearance Dimensional Drawing
Pad-mounted installation
Step 2 - Plan for Sequence of Unit Installation
Table 1 - Operating Weights
Curb-mounted installation
C10365
Fig. 3 - Roof Curb Details
548J*14D
Fig. 4 - Unit Leveling Tolerances
For Units with Accessory Electric Heaters
Step 5 - Field Fabricate Ductwork
Step 6 - Rig and Place Unit
Economizer Hood Removal and Setup Factory Option
Step 7 - Convert to Horizontal and Connect Ductwork when required
Step 8 - Install Outside Air Hood
Fig. 6 - Retrofit Installation Dimensions
548J*14D
Fig. 9 - Economizer Wiring
Two Position Damper Hood Removal and Setup - Factory Option
Fig. 10 - Damper Assembly
Economizer Hood and Two-Position Hood
Step 9 - Install External Condensate Trap and Line
Fig. 11 - Indoor Coil Access Panel Relocation
Fig. 13 - Economizer Filter Installation
Fig. 16 - Conduit into Factory Option Disconnect
Field Power Supply
Step 10 - Make Electrical Connections
Fig. 15 - Condensate Drain Piping Details
548J*14D
Fig. 21 - Disconnect Switch and Unit All Units
Fig. 19 - Mounting Position for Field Disconnects over 100A
Fig. 20 - Mounting Position for Field Disconnects up to 100A
ELECTRICAL OPERATION HAZARD
Units Without Factory-Installed Disconnect
Units with Factory-Installed Disconnect
Fig. 22 - Power Wiring Connections Convenience Outlets
ELECTRICAL OPERATION HAZARD
Fig. 24 - Unit Powered Convenience Outlet Wiring
Fig. 25 - Weatherproof Cover Installation
548J*14D
Fig. 26 - Thru-Base Connection Fittings
Field Control Wiring
Factory-Option Thru-Base Connections
Thermostat
Unit without Thru-Base Connection Kit
Heat Anticipator Settings
Fig. 28 - Thermostat Wire Routing
Electric Heaters
Heater and Supplementary Fuses
Fig. 30 - Typical Single Point Installation
Single Point Boxes
Fig. 29 - Typical Component Location
Return Air Enthalpy Sensor
Fig. 31 - Accessory Electric Heater Control Connections
Fig. 32 - Outside and Return Air Enthalpy Sensor Wiring
Outdoor Air Enthalpy Control PNO 33CSENTHSW
548J*14D
RTU-MP Control System
Fig. 33 - RTU-MP Multi-Protocol Control Board
Fig. 34 - 548J*14D Control Box Component Locations
C10322
Fig. 35 - RTU-MP System Control Wiring Diagram
548J*14D
548J*14D
Supply Air Temperature SAT Sensor
Table 2 - RTU-MP Controller Inputs and Outputs
CONFIGURABLE INPUTS
Field Connections
Outdoor Air Temperature OAT Sensor
Space Temperature SPT Sensors
Fig. 37 - T-55 Space Temperature Sensor Wiring
Indoor Air Quality CO2 sensor
Fig. 41 - Space Temperature Sensor Typical Wiring 33ZCT59SPT
33ZCSENCO2 - Typical Wiring Diagram
Fig. 40 - RTU-MP T-56 Sensor Connections
Outdoor Air Quality Sensor PNO 33ZCSENCO2 plus
Connecting Discrete Inputs
Fig. 43 - RTU-MP / Indoor CO2 Sensor
33ZCSENCO2 Connections
RTU-MP Troubleshooting
Communication Wiring - Protocols
Fig. 46 - RTU-MP Power Exhaust Connections
Local Access
548J*14D
Fig. 48 - BACview 6 Handheld Connections
Table 3 - LEDs
The LEDs on the RTU-MP show the status of certain functions
Controller
Fig. 49 - Controller Assembly
Smoke Detectors
System
Return Air without Economizer
Smoke Detector Locations
Supply Air
Fig. 51 - Typical Supply Air Smoke Detector Sensor Location
Additional Application Data
Completing Installation of Return Air Smoke Sensor
Fig. 53 - Return Air Detector Shipping Position
Fig. 54 - Return Air Sensor Operating Position
HIGH
Table 4 - Unit Wire/Fuse or HACR Breaker Sizing Data
548J*14D
NOTE See page 32 for table legend and notes
HIGH
Table 4 - Unit Wire/Fuse or HACR Breaker Sizing Data cont
548J*14D
Legend and Notes for Table
Step 11 - Adjust Factory-Installed Options
Fig. 55 - EconoMi$ert IV Wiring
EconoMi$er IV Occupancy Switch
548J*14D
Step 12 - Install Accessories
Pre-Start and Start-Up
548J*14D
548J*14D
Replaces II548J
548J*14D
Catalog No. II548J---07
Edition Date 01/11