START-UP CHECKLIST

(Remove and Store in Job Files)

I. PRELIMINARY INFORMATION MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

II. PRESTART-UP (Insert check mark in box as each item is completed)

( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE

( ) VERIFY THAT UNIT INSTALLATION IS LEVEL

( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III.START-UP ELECTRICAL SUPPLY VOLTAGE COMPRESSOR AMPS

INDOOR (EVAPORATOR) FAN AMPS

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE

 

 

 

 

DB

 

RETURN-AIR TEMPERATURE

 

 

 

 

 

 

DB

WB

COOLING SUPPLY AIR

 

 

DB

 

 

 

 

 

 

WB

 

HEAT PUMP SUPPLY AIR _____________________

 

ELECTRIC HEAT SUPPLY AIR _____________

 

 

 

 

 

 

 

PRESSURES

 

 

 

 

 

 

 

 

 

 

 

REFRIGERANT SUCTION

 

 

 

PSIG, SUCTION LINE TEMP*

 

REFRIGERANT DISCHARGE

 

 

 

 

 

 

PSIG, LIQUID TEMP{

 

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

* Measured at suction inlet to compressor

{Measured at liquid line leaving condenser.

607C-- -- A

29

Page 29
Image 29
Bryant 607C-A Remove and Store in Job Files, Preliminary Information Model no, Temperatures, Pressures