Synergy 600 user guide ~ 6th Edition ~ 20th June ’01 ~ 3718
Setting up
Follow these steps to set up your Synergy 600 ready for use
SETTING UP
Plan the location
Position your Synergy 600 within 2 metres of a power socket and phone socket otherwise extension cables will be required.
Make sure it is at least 1 metre away from other electrical products to avoid interference.
Do not place your Synergy 600 product in the bathroom or other humid areas.
1Connect the power supply to the base
Plug the power supply cable into the power socket on the underside of your base.
Plug the power adaptor into the mains power socket and switch on. The green Power/In Use light comes on.
Note
The base station must be plugged into the mains power socket at all times.
Do not connect the telephone line cord to the phone socket until your handset is fully charged. This will prevent the risk of the phone being answered before the battery pack is charged. Answering the phone before the battery pack is fully charged may prevent it from reaching its optimum capacity.
|
| Warning | |
| Under no circumstances should a | ||
| |||
| used. Only use the approved battery | ||
| pack. Using an unapproved battery | ||
L | pack will invalidate your guarantee | ||
and may damage the telephone. | |||
|
7