Bunn CDS-3 manual WHIPPER MOTOR cont, SERVICE cont

Models: CDS-3

1 34
Download 34 pages 40.35 Kb
Page 17
Image 17
WHIPPER MOTOR (cont.)

SERVICE (cont.)

WHIPPER MOTOR (cont.)

when reconnecting wires.

13.Slide the slinger onto the motor shaft flush against the front panel.

14.Wash whipper chamber components in a mild solution of dish detergent using a bristle brush.

15.Rinse thoroughly and allow to dry before reinstalling in the dispenser.

16.Slide whipper chamber receptacle with seal and O-ring onto the motor shaft.

17.Rotate the receptacle with seal counterclockwise until it snaps into place on the motor mounting nuts.

18.Push frother onto the motor shaft, making sure the flat in the frother lines up with the flat on the motor shaft.

19.Connect the red/black and green wires to the hopper switch, Fig.10 and install the hopper support panel using the four #8-32 screws.

20.Install whipper chamber on the whipper chamber receptacle by twisting counterclockwise until tabs on the whipper chamber lock with the tabs on the whipper chamber receptacle. Be sure dispense port is pointing down.

BLK

WHI/RED to Control Board (J7-2)

WHI/BRN to Control Board (J7-4)

P1903

FIG. 9 WHIPPER MOTOR TERMINALS

21.Install dispense tip into the bottom of the whipper chamber.

22.Slip the mixing chamber onto the mixing chamber water inlet tube far enough so the mixing chamber will seat inside the whipper chamber.

23.Install hopper assembly in the dispenser by slid- ing hopper assembly on the hopper support panel until the slot in the bottom rear of the hopper seats against the pin and retainer plates on the hopper support panel.

GRN to Control Boad (J1-8)

RED/BLK to Control Board (J1-10)

P1904

FIG. 10 HOPPER SWITCH TERMINALS

17

29793 061599

 

Page 17
Image 17
Bunn CDS-3 manual WHIPPER MOTOR cont, SERVICE cont