Bunn LCR-1, LCA-1 service manual Initial Fill & Heat

Models: LCA-1 LCR-1

1 23
Download 23 pages 51.01 Kb
Page 10
Image 10
INITIAL FILL & HEAT

INITIAL FILL & HEAT

1.Select Normal and Run on the Selector switches.

2.Confirm the water supply is on.

3.Connect the dispenser to the power source.

4.The Red POWER LED will illuminate and water will begin flowing into the tank. The dispenser will automatically stop filling when the tank is full. The dispenser will not begin heating the water until after the tank is filled. The LCR-1 will begin to cool the cabinet after a 3 min. delay.

5.The Green READY LED will illuminate when the tank temperature reaches the preset Ready temperature.

1

5 4

10

44806.1 081211

 

Page 10
Image 10
Bunn LCR-1, LCA-1 service manual Initial Fill & Heat