Bunn TB3Q User Notices, Water Sweetener Inlet Inlet, #00831.0000, Electrically ground the chassis

Models: TB3Q TB3Q-LP

1 27
Download 27 pages 51.73 Kb
Page 3
Image 3
USER NOTICES

USER NOTICES

Carefully read and follow all notices on the equipment and in this manual. They were written for your protec- tion. All notices on the equipment should be kept in good condition. Replace any unreadable or damaged labels.

#00831.0000

#37881.0000

!WARNING

#00831.0000 Fill water tank before turning - on - thermostat or connecting appliance to power source.

 Use only on a properly protected circuit capable of the rated load. Use only on a properly protected circuit capable of the rated load.

 Electrically ground the chassis. Electrically ground the chassis.
 Follow national/local electrical codes.  Do not use near combustibles. Follow national/local electrical codes. FAILURE TO COMPLY RISKS EQUIPMENT Do not use near combustibles.
FAILURE TO COMPLY RISKS EQUIPMENT

DAMAGE, FIRE, OR SHOCK HAZARD

READ THE ENTIRE OPERATING MANUAL

BEFORE BUYING OR USING THIS PRODUCT

THIS APPLIANCE IS HEATED WHENEVER

CONNECTED TO A POWER SOURCE

00831.0000F 3/98 ©1998 BUNN-O-MATIC CORPORATION

#03408.0000

#03409.0000

#00656.0000

#03537.0000

#26371.0000#26371.0001

WATER SWEETENER

INLET INLET

To reduce the risk of electric shock, do not remove or open cover.

No user-serviceable parts inside. Authorized service personnel only. Disconnect power before servicing.

#06064.0000

WARNING

FILL WATER TANK BEFORE ENERGIZING

DO NOT OVERLOAD CIRCUIT

KEEP AWAY FROM COMBUSTIBLES

DO NOT DEFORM PLUG OR CORD

SEE

INSTRUCTIONS

FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK

BREWER ENERGIZED UNLESS UNPLUGGED

#32540.0000

BREWERS

TIMER SETTING

CAUTION – Disconnect the power source from the brewer prior to the removal of any panel for the replacement or adjustment of any component.

NOTE: Check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place, prior to setting or modifying batch sizes.

1.Modifying batch sizes. To modify a batch volume, first check that the SET/ LOCK switch is in the “SET” position on the circuit board. If the brewer has a batch selector switch, position it to the size to be changed.

To increase a batch size, Press and hold the START or BREW switch until three clicks are heard. Release the switch and then press it again one or more times. Each time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has been achieved.

To decrease a batch size, Press and release the START or BREW switch once for every two-second interval to be removed from the total brew time period; then immediately press and hold down the START or BREW switch until three clicks are heard. Release the switch. Allow the brew cycle to finish in order to verify that the desired volume has been achieved.

2.Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. Press and hold the START or BREW switch until three distinct clicks are heard (this will take approximately ten seconds), and then release the switch. (Failure to re- lease the switch within two seconds from the third click causes the volume setting to be aborted). View the level of the liquid being dispensed. When the desired level is reached, turn the ON/OFF switch to “OFF”. The brewer remembers this volume and will continue to brew batches of this size until

the volume setting procedure is repeated. Empty server(s), turn selector switch to positions that have yet to be set, and repeat batch setting proce- dure until all batch sizes are set.

NOTE: When brewing coffee, batch volumes will decrease due to absorption by the coffee grounds.

32540.0000C 09/01 ©1999 Bunn-O-Matic Corporation

Page 3

37236 050305

 

Page 3
Image 3
Bunn TB3Q User Notices, Water Sweetener Inlet Inlet, To reduce the risk of electric shock, do not remove or open cover