ASSEMBLY
Flailhead Attachment
Operate machine controls to maneuver boom arm into flail head attachment. The bottom of the hose connection bracket must be parallel with the ground. Refer to torque chart for correct bolt torque settings.
With the arms at half reach and the flail head clear of the ground carry out final adjustment of the lift arm leveling box to bring the main frame horizontal. Carefully operate the machine through its full range of movements while checking that the hoses are not strained, pinched, chaffed or kinked and that all movements are functioning correctly. Fold the machine into the transport position. The machine is now ready to proceed to the work site.
RMB 1865 11/10 | Assembly Section |
© 2010 Alamo Group Inc.