ASSEMBLY
ASSEMBLY
•Fit the machine to top link (Optional Top Link available).
•Raise machine on tractor linkage until the tractor’s PTO and the machine’s gearbox stub shaft are approximately in line.
RMB 1865 11/10 | Assembly Section |
© 2010 Alamo Group Inc.