Lincoln Electric SVM127-A service manual Mounting Screws Insulators Gear BOX Assembly

Models: SVM127-A

1 135
Download 135 pages 50.71 Kb
Page 126
Image 126

TOC

TOC

F-68

F-68

TROUBLESHOOTING & REPAIR

DRIVE MOTOR REMOVAL AND REPLACEMENT (continued)

Return to Section

Return to Section TOC

Return to Master

Return to Master TOC

15.With the slot head screw driver, remove the three screws, lock washers, flatwashers, and insulators holding the drive motor to the gear box assembly. See Figure F.28.

16.Carefully remove the motor and spacer plate.

REASSEMBLY

17.Attach the drive motor and spacer plate to the gear box assembly. Use the insulators and mounting hardware from step 15, above.

18.Attach the glastic mounting board and mylar insulator to the gear box assembly with the four 1/2" bolts and washers. On four-roll units, install the 1/2" bolt for the reed switch copper energizer.

19.From the right side, slide the motor and gear box assembly into the LN-9. Attach the glas- tic mounting to the floor with the screws. Four-roll units have nuts and washers.

20.Connect motor leads #626, #627, #539, #541, #527 and #528 to their terminals. Attach the green motor ground lead. Install any cable ties cut earlier or tape the harness as needed.

21.Attach the top motor plate with two screws.

22.Install the insulator and tach PC board hous- ing with two screws. Install the tach PC board and rotating disc and spacers. See the Tach PC Board Removal and Replacement procedure.

23.Install the 9-pin amphenol and the R1 resis- tor. Be sure to position the resistor insula- tors properly.

24.Close and fasten the left cover assembly with screws.

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

FIGURE F.28 – DRIVE MOTOR REMOVAL FROM GEAR BOX

MOUNTING

SCREWS AND

INSULATORS

GEAR BOX

ASSEMBLY

LN-9 Wire Feeder

Page 126
Image 126
Lincoln Electric SVM127-A service manual Mounting Screws Insulators Gear BOX Assembly