Lincoln Electric SVM127-A Voltmeter Accuracy Test, Figure F.8 Voltmeter Connection Point

Models: SVM127-A

1 135
Download 135 pages 50.71 Kb
Page 93
Image 93

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-35

F-35

TROUBLESHOOTING & REPAIR

VOLTMETER ACCURACY TEST (continued)

FIGURE F.8 – VOLTMETER CONNECTION POINT

Return to Section TOC

Return to Master TOC

BRASS

CONDUCTOR

BLOCK

TEST PROCEDURE

Perform the following checks with the LN-9 wire feeder connected to a Lincoln CV welding power source according to the proper connection dia- gram. (See the Installation section of this man- ual.)

See Figure F.8 for this test.

1.Lift the right side cover assembly.

2.Connect the test meter (see Materials Needed) between the brass conductor block on the wire feeder and the work piece.

Return to Section TOC

Return to Master TOC

LN-9 Wire Feeder

Page 93
Image 93
Lincoln Electric SVM127-A service manual Voltmeter Accuracy Test, Figure F.8 Voltmeter Connection Point