B-9

B-9

OPERATION

Return to Section TOC

DRIVE ROLL INSTALLATION AND PRESSURE SETTING

CHANGING WIRE FEED ROLLS AND GUIDE TUBES FOR TWO-ROLL WIRE FEEDERS

To change drive or idle rolls on a two-roll wire feeder, refer to Figure B.3 and perform the following steps:

1.Loosen idle roll spring pressure screw.

2.Remove clamping collar from the drive shaft.

3.Install drive roll and replace clamping collar. Tighten screw.

4.Remove idle roll shaft screw - install idle roll. Replace screw and tighten.

NOTE: The Aluminum Wire Drive Roll Kits have one-piece drive rolls and idle rolls with a larger chamfer on one side, instead of gear teeth. This larger chamfer side must face the gearbox when installed. The side with the smaller chamfer and wire size stencil must be installed facing out.

5.Remove the large ingoing guide from rear brass block by loosening screw.

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

FIGURE B.3 – 2 ROLL WIRE FEED MECHANISM

OUTGOING

CLAMPING

INGOING GUIDE TUBE

COLLAR

DRIVE

CLAMPING SCREW

GUIDE TUBE

 

 

 

 

ROLL

 

LOCKING

SCREW

GUIDE

SCREW

SCREW

 

TUBE

 

 

 

 

 

 

 

INGOING

 

 

 

GUIDE

 

 

 

TUBE

IDLE ROLL

IDLE

IDLE ROLL SPRING

SHAFT SCREW

ROLL

PRESSURE SCREW

LN-9 Wire Feeder

Page 29
Image 29
Lincoln Electric SVM127-A Drive Roll Installation and Pressure Setting, Figure B.3 2 Roll Wire Feed Mechanism