Contents
INSTALLATION Step 1 - Provide Unit Support
Installation Instructions
CONTENTS
SAFETY CONSIDERATIONS
Step 4 - Make Unit Duct Connections
Fig. 1 - Roof Curb - 48AJ,AK020-035Units
Fig. 2 - Roof Curb - 48AJ,AK036-050Units
Fig. 3 - Roof Curb - 48AJ,AK051 and 060 Units
a48-8235
Fig. 4 - Base Unit Dimensions - 48AJ,AK020-035
a48-8236
Fig. 5 - Base Unit Dimensions - 48AJ,AK036-050
Fig. 6 - Base Unit Dimensions - 48AJ,AK051 and
A48-8380
Fig. 7 - Base Unit Dimensions - 48AW,AY020-035
Fig. 8 - Base Unit Dimensions - 48AW,AY036-050
a48-8240
GRAVITY, OPERATING AND CORNER WEIGHTS, SEE FIGURE
Fig. 9 - Base Unit Dimensions - 48AW,AY051 and
FOR CENTERS OF
a50-8102
Table 1 - Physical Data - 48AJ,AK,AW,AY Units
UNIT 48AJ,AK,AW,AY
UNIT 48AJ,AK,AW,AY
a48-8246
ALL PANELS MUST BE IN PLACE WHEN RIGGING
CAUTION - NOTICE TO RIGGERS
Fig. 11 - Rigging Information
Table 5 - Variable Volume Fan Motor Weights
Table 2 - Unit Operating Weights
Table 3 - Option and Accessory Weights
Table 4 - Constant Volume Fan Motor Weights
a48-8241
Table 6 - Evaporator Fan Motor Data
Fig. 12 - Air Distribution - Thru-the-Bottom
Fig. 13 - Air Distribution - Thru-the-Side
Step 5 - Install Flue Hood
Table 7 - 48A Series Staged Gas Control
Fig. 19 - Field Power Wiring Connections
Step 8 - Make Electrical Connections
Fig. 18 - Field Gas Piping
UNIT
UNIT
46.2
UNIT
UNIT
30.8
46.2
UNIT
1.Remove cap from red 208 v wire
Fig. 22 - Space Temperature Averaging Wiring
Fig. 20 - Field Control Thermostat Wiring
Fig. 21 - Space Temperature Sensor Wiring
Table 10 - Color Code Recommendations
Table 9 - CCN Connection Approved Shield Cable
Right Side/Center Economizer Hood Shown
Fig. 24 - Economizer Hood Assembly
Fig. 23 - Adding Seal Strip to Top of Hood Sides
a48-8498
Fig. 27 - Adding Foam Strip to Cross Member
to Filter Track Assembly
Fig. 26 - Adding Seal Strip to Back of Hood Top
Mounting Flange
Step 11 - Route VAV Static Pressure Sensors
Fig. 33 - Pressure Transducer Locations
Step 13 - Field Modifications
INSIDE
Fig. 34 - Side Return Air Conversion
a48-8245
31.25”